INSTALLATIONS ![]()
AREA 1 - ILHA DO VIANA
5.000 m² area for the construction of steel vessels. It has a longitudinal launching berth with 26 meters in breadth and 83 meters in length, it has along its length a gantry crane with capacity for 50 tons and administrative building with capacity for 400 people.
![]() |
|
|---|
![]() |
|
|---|
FACILITIES AND EQUIPMENT |
|
|
|---|
AREA 2 - ILHA DE SANTA CRUZ
The implementation of this area, with 8.000 m² and 22.000 m², will be divided in two stages. The area will have two production lines for the construction of steel vessels (PSV 3000, ORSV, U 15000) and aluminum vessels (crew boats and fast motorboats), whose installations will have cafeteria, warehouse, administrative area, sheds for workshops, jet and treatment, processing and cutting, submounting , mounting and edification, 120 meters wharf and crane. With the expansion of the production line sheds, the area will have two longitudinal launching berth endowed in their gantry crane extensions with the capacity for vessels up to 120 meters in length.
|
![]() |
|
|---|
FACILITIES AND EQUIPMENT OF THE PILOT PLAN |
|
|---|